As 2019 comes to an end, the work on Trinity Presbyterian Church and the Bryant Neighborhood Center continue!
In the Sanctuary, we can see the start of the floor separating our two new classrooms!
The Radiators are gone! Thanks to our updated HVAC system, the antiquated hunks of metal have been removed from the Sanctuary, Sunday School rooms, Fellowship Hall, and everywhere else!
Outside, the Stair Tower is rising tall! A new, ADA Ramp is coming next, fitting in the space between the stair tower and Trinity House.
In the Bryant Neighborhood Center, we see some big changes, especially in the kitchen!
Before construction, the kitchen was a Sunday School Room with a Dutch Door Entrance (red). This is being filled in to facilitate a new custodial closet. The New Kitchen will have a big, open, pass-through window (green), and a door directly into the Great Room (blue).
The old, unused fireplace has been removed, and now the wall is being framed in to fill the gap. Current plans put the oven here, where the fireplace used to be.
From the Great Room, we look at the kitchen and see the new Kitchen Door (blue), the Pass-Through Window (green), and enlarged Custodial Closet (orange).
And the work continues! Crew of Trinity volunteers are scrapping walls in preparation for paint, Cascade Masonry continues their work of cleaning and restoring the exterior brick, and the team at Mountain Construction continues to press on. We are so grateful for the many talented hands who keep this project moving forward into the new year!